woocommerce domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/kiasuren/public_html/wp-includes/functions.php on line 61211. Design proposal & space planning.
2. Project management & site supervision.
1. Hack existing wall & floor tiles for a bathrooms.
2. Dismantle existing 1x WC, washing basin, bathrooms door.
1. Apply water prepacked waterproofing screed for a bathroom
2.
Lay full height wall tiles at for a bathroom. (Base on 30 x 60 cm, <$3.20)
3. Lay homogenous floor tiles for a bathroom. (Base on 30 x30 cm, <$3.00)
1. To install 1 x WC, washing basin with tap, water heater & bathroom accessories
**All Items to be provided by Owner
2. To run stainless steel expose pipe for a bathroom
1. Supply and install heater point x 1 no
2. Supply and install Single light point x I no.
3. Supply and install Single light fitting xI no.
1. Supply and painting of a bathroom ceilings and sewer piping with Nippon.
2. To clean a bathroom with Acid Chemical wash
3. Provide corrugated paper for protection
4. To load up materials and unload dispose all debris material after hack/dismantle works
5. Supply and install bi-fold door.
6. Supply and install adjustable louver window
7. HDB Renovation permit.