1. Design proposal & space planning.
2. Project management & site supervision.
1. Hack existing wall & floor tiles for a bathrooms.
2. Dismantle existing 1x WC, washing basin, bathrooms door.
1. Apply water prepacked waterproofing screed for a bathroom
2.
Lay full height wall tiles at for a bathroom. (Base on 30 x 60 cm, <$3.20)
3. Lay homogenous floor tiles for a bathroom. (Base on 30 x30 cm, <$3.00)
1. To install 1 x WC, washing basin with tap, water heater & bathroom accessories
**All Items to be provided by Owner
2. To run stainless steel expose pipe for a bathroom
1. Supply and install heater point x 1 no
2. Supply and install Single light point x I no.
3. Supply and install Single light fitting xI no.
1. Supply and painting of a bathroom ceilings and sewer piping with Nippon.
2. To clean a bathroom with Acid Chemical wash
3. Provide corrugated paper for protection
4. To load up materials and unload dispose all debris material after hack/dismantle works
5. Supply and install bi-fold door.
6. Supply and install adjustable louver window
7. HDB Renovation permit.